Lead-Safe Renovation: What Your Contractor Must Do
If your home was built before 1978, a contractor who disturbs painted surfaces is required to follow federal and Washington lead-safe work rules. This guide explains what those rules require, what compliant work looks like on site, and which steps are easiest to miss.
Test or presume it’s positive: the first decision
A firm can presume lead-based paint is present and follow RRP practices, or it can test the components the job will disturb. Only components shown to be below the lead-based paint threshold are exempt. Under 40 CFR 745.82, that determination can come from:
- A certified lead inspector or risk assessor, usually using an XRF (X-ray fluorescence) analyzer, which measures lead in all the paint layers on a surface without damaging it.
- A certified renovator using an EPA-recognized test kit. Kits are recognized for negative results only, and only on certain surfaces (40 CFR 745.88). No kit reliably confirms that lead is present.
- A certified renovator collecting paint chips for analysis by an EPA-recognized laboratory.
Lead-based paint is defined as paint with lead at or above 1.0 milligram per square centimeter (mg/cm²) or 0.5% by weight. The mg/cm² figure measures how much lead sits in the paint layers over a small area of surface. It says nothing directly about lead in dust or air. A reading below 1.0 means the component falls outside the RRP rule, not that it is lead-free, so basic dust control is still sensible.
When testing saves money, and when it doesn’t
On a small project, presuming is usually cheaper. An Environix XRF inspection is $725 for the first hour, and on a one-room job that can exceed the added cost of simply doing the work lead-safe.
On a large or complex remodel, testing can pay for itself when there is a reasonable chance results come back negative. Every component below 1.0 mg/cm² drops out of the RRP scope, which can mean less containment, less specialized cleaning, and fewer tool restrictions. The odds depend heavily on age. Across 91 Environix XRF inspections from late 2024 to October 2026, the share of homes with at least one lead-based paint reading was:
- Built before 1920: 100% (17 homes)
- 1920 to 1939: 89% (19 homes)
- 1940 to 1959: 53% (30 homes)
- 1960 to 1977: 32% (19 homes)
Material matters too. About 1% of our readings on drywall were positive, compared with 18% on painted wood. A 1960s or 1970s home with drywall walls is a strong candidate for testing before a large remodel. In an older home, testing rarely clears the whole job, but it shows your contractor exactly which components need lead-safe handling. These are small samples, and clients usually chose which components to test, so treat the figures as a guide rather than a prediction for your house. For a fuller cost comparison, see Test or presume lead? When testing saves money on a remodel.
If the test is positive, or they assume it is positive, a certified renovator is in charge, the work area is sealed with plastic, dust-generating methods are restricted, cleanup follows a specific procedure, and you receive a copy of the compliance records. These requirements come from the EPA Renovation, Repair and Painting (RRP) Rule and Washington’s version of it, chapter 365-230 WAC, which the Washington Department of Commerce administers.
The rule exists because of dust. Sanding, cutting, or demolishing lead-painted surfaces produces fine lead dust that settles on floors and windowsills, where young children pick it up on their hands. The Washington Department of Health identifies unsafe remodeling as one of the major causes of lead exposure in the state, and the CDC states that no safe blood lead level in children has been identified.
When the RRP rule applies
The rule covers renovation done for pay in pre-1978 housing and in child-occupied facilities such as daycares. It applies to general contractors, painters, window installers, electricians, plumbers, and HVAC technicians alike. What matters is whether the work disturbs painted surfaces, not which trade is doing it.
Small jobs are exempt as “minor repair and maintenance.” WAC 365-230-310 defines that as work that disturbs:
- Interior: 6 square feet or less of painted surface per room, about the size of a 2-by-3-foot patch.
- Exterior: 20 square feet or less of painted surface.
Three things remove that exemption no matter how small the job: any window replacement, any demolition of painted surfaces, and use of any prohibited practice listed below. Jobs in the same room within 30 days count as one job, so splitting work into small pieces does not avoid the rule.
If you’re doing the work yourself
Commerce states that the RRP rules do not apply to homeowners working on their own primary residence. The dust behaves the same either way. If you plan to sand, scrape, or demolish painted surfaces yourself, the containment and cleaning methods described below are the practical standard, and Commerce links to EPA guidance for do-it-yourselfers on its lead-based paint resources page.
If you own a rental
Commerce’s firm certification applies to landlords and property managers who do renovation, repair, or painting work on their own pre-1978 rentals, not only to the contractors they hire.
What compliant work looks like
Before work starts
- Firm certification. The company must hold an RRP firm certification from Commerce. Commerce publishes lists of certified RRP companies, along with enforcement records, on its resources page.
- A certified renovator assigned to the job. That person must keep copies of their current training certificates at the work site (40 CFR 745.90). Asking to see them is reasonable.
- The lead pamphlet. No more than 60 days before work begins, the firm must give you EPA’s lead renovation pamphlet, Renovate Right, and get your signed acknowledgment, or mail it at least 7 days before work starts (40 CFR 745.84).
Containment
Before work begins, the firm must isolate the work area so that no dust or debris leaves it (40 CFR 745.85). For interior work, expect:
- Warning signs marking the work area.
- Furniture, rugs, and window coverings removed or covered with sealed plastic.
- HVAC ducts in the work area closed and covered with taped plastic.
- Windows and doors closed, with doors covered in plastic and a flap where workers pass through.
- Floors covered with taped plastic at least 6 feet beyond the surfaces being worked on.
For exterior work, doors and windows within 20 feet are closed and the ground is covered with plastic at least 10 feet out from the work. Vertical containment is required when work is within 10 feet of a property line. The certified renovator must be physically present while signs go up, while containment is built, and during cleaning, and must be reachable by phone the rest of the time.
During the work
Three practices are restricted because they turn paint into fine dust or fumes:
- Open-flame burning or torching of painted surfaces is prohibited.
- High-speed removal (power sanding, grinding, power planing, needle guns, abrasive blasting) is prohibited unless the tool has a shroud and a HEPA vacuum attachment collecting dust at the source.
- Heat guns must operate below 1,100°F.
High-speed tools break paint into particles small enough to stay airborne and drift beyond the plastic. A HEPA (high-efficiency particulate air) filter traps fine particles that an ordinary shop vacuum blows back into the room. Waste must be bagged and kept contained, including overnight.
Cleaning and cleaning verification
After the work, the firm collects chips and debris, mists and folds the plastic dirty side in, HEPA-vacuums surfaces, and wet-wipes and wet-mops the work area plus 2 feet beyond it. The certified renovator then performs cleaning verification: a visual inspection, followed by wiping windowsills, floors, and countertops with a damp disposable cloth and comparing each cloth to an EPA cleaning verification card. Floors are wiped in sections smaller than 40 square feet. A cloth darker than the card means that surface gets cleaned again. For exterior jobs, verification is visual only.
Cleaning verification is a reasonable field check, but it is a visual comparison, not a measurement. It does not tell you how much lead remains in the dust. That number comes from dust-wipe samples analyzed by a laboratory and reported in micrograms per square foot (µg/ft²). A microgram is one millionth of a gram, so these are amounts no one can see.
The standards for those numbers changed recently. Under EPA’s 2024 dust-lead rule, with compliance beginning January 12, 2026, any lead detected in dust by a recognized lab is reportable, and the action levels are 5 µg/ft² for floors, 40 µg/ft² for windowsills, and 100 µg/ft² for window troughs. Washington’s rule still lists the older levels of 10, 100, and 400 µg/ft², and Commerce began rulemaking in 2026 to align with EPA. Until the state rule changes, compare any results to both.
You can ask for more than the minimum. The federal rule allows dust clearance testing in place of cleaning verification when your contract requires it (40 CFR 745.85(c)). [VERIFY: confirm WAC 365-230 includes the same option.] Samples must then be collected by a certified inspector, risk assessor, or dust sampling technician, and the firm must re-clean until results are below the applicable levels. If you add this to your contract, name the standard you expect and who will collect the samples. More on this in How to verify your contractor cleaned up.
After the job
When the final invoice is delivered, or within 30 days of completion if that comes first, the firm must give you documentation of compliance (40 CFR 745.86). It should name the certified renovator, confirm that workers were trained, describe the containment and cleaning, and record the cleaning verification result. The firm must keep its records for 3 years. Keep your copy with your home documents; it is useful if you sell or if questions come up later.
Steps that are easy to miss
Most certified contractors want to get this right, but the rule has many small steps. [TIM: confirm, reorder, or replace from field experience.] These are worth a look:
- Uncovered HVAC registers. An open supply or return in the work area can carry dust through the house.
- Plastic that stops short. Floor sheeting is required at least 6 feet beyond the work, not just along the wall.
- The wrong cleanup tools. Dry sweeping or a standard shop vacuum spreads fine dust. The rule calls for a HEPA vacuum and wet methods.
- Window replacement treated as minor work. Replacing any window is covered, no matter how little paint is involved.
- Cleaning verification you never see. Ask when it will happen and ask for the result.
- No paperwork at the end. The compliance records are required, not a courtesy.
If something doesn’t look right
Start with a direct conversation. Most problems, like torn plastic or an open register, take minutes to fix once someone points them out. If unsafe work continues, keep children and anyone pregnant out of the area, photograph what you see, and contact the Commerce Lead-Based Paint Program at 360-586-5323. If dust may have spread, dust-wipe testing shows where lead is and whether cleanup worked. If a child may have been exposed, ask your pediatrician about a blood lead test. The CDC uses a reference value of 3.5 micrograms per deciliter (µg/dL) to identify children with more lead in their blood than most. See also Your contractor cut corners: what to do now.
Where Environix fits
Environix does not perform renovation, lead removal, or abatement, so we have no financial stake in what your results show. We provide XRF lead inspections before a remodel, so you and your contractor know which components need lead-safe handling, and post-renovation dust-wipe testing to check the cleanup. We have served King, Snohomish, and Pierce Counties since 2003. Learn more about our lead testing services or call 800-351-9563.
Written by James Mallory, owner of Environix. Reviewed by Timothy Klassen, Washington State Certified Lead Risk Assessor (Department of Commerce Cert. #6330).
